
Professional multiplex framing in Toronto. Expert framing for duplexes, triplexes, and multi-unit residential construction projects.
Konstruction Group provides expert framing, insulation, and drywall services for multiplex projects throughout Toronto. We supply and install all framing - including CFS (cold-formed steel) with our own in-house takeoffs at the lowest market rates. From duplexes to fourplexes and townhouse developments, our experienced crews understand the unique requirements of multi-family construction including fire separations, sound isolation, and efficient unit layouts. We deliver quality framing that meets stringent building code requirements for multi-unit dwellings.


Multi-unit buildings require fire-rated separations between dwelling units. Ontario Building Code mandates specific fire resistance ratings (typically 1-hour or 2-hour) for party walls, floor/ceiling assemblies, and certain structural elements. Many multiplexes use CFS (cold-formed steel) framing for fire-rated assemblies - we supply and install steel studs with our own in-house takeoffs, giving you competitive pricing and accurate material quantities. For enhanced fire protection, we also offer spray-applied fireproofing and firestop services.
One of our specialties is installing built-up beams (box beams) along the perimeter of subfloors for fire separation purposes. We assemble these beams by hand on-site to ensure precise fit and proper fire blocking. This critical detail prevents fire spread between units at floor assemblies - a requirement that many framers overlook or execute poorly. No matter how complex your fire separation details are, we can take care of it. From intricate party wall intersections to stepped floor assemblies and mechanical penetrations, our crews have the experience to frame it right the first time. Complex details don't intimidate us - they're where our expertise shines.
For multiplexes requiring cold-formed steel framing, we provide complete supply and install packages at the lowest market rates. Our team performs CFS takeoffs in-house - no third-party estimators or middleman markup on materials. We buy steel studs, track, and accessories at contractor pricing and pass those savings to you. Whether your multiplex uses CFS for load-bearing exterior walls, party walls, or both, you get competitive pricing with single-source accountability. We also install steel beams and moment frames for structural support.
Sound transmission between units is a major concern in multiplexes. Effective sound isolation starts with framing design - staggered stud walls, resilient channels, and proper detail at connections all contribute to acoustic performance. We frame party walls and floor assemblies to accept sound-reducing insulation and achieve the STC ratings your tenants expect. For complete acoustic solutions, explore our soundproofing services which pair perfectly with proper framing techniques.

We review architectural and structural drawings, noting fire separation requirements and unit configurations.
Typical timeline: 1-2 daysItemized estimate covering all framing including party walls, floor assemblies, and special requirements.
Typical timeline: 3-5 daysLumber, engineered products, and fire-rated components ordered for timely delivery.
Typical timeline: 1-2 weeksSill plates, floor joists, and subfloor installation with proper fire blocking locations.
Typical timeline: 1-2 weeksExterior walls and fire-rated party walls erected, plumbed, and braced.
Typical timeline: 2-4 weeksAdditional floor systems, walls, and complete roof structure installed.
Typical timeline: 2-4 weeksFraming reviewed, deficiencies corrected, ready for building inspection.
Typical timeline: 1-2 daysA duplex is typically a single building containing two dwelling units, owned by one party. Semi-detached homes are two separate legal properties that share a common wall, each with separate ownership. From a framing perspective, both require fire-rated party walls, but ownership structure and legal requirements differ.
Yes, multi-unit residential buildings have additional permit requirements beyond single-family homes. This includes zoning approval (many Toronto properties now allow multiplexes), fire separation documentation, and multiple inspections. Buildings over certain sizes may require sprinkler systems and additional fire safety measures.
Fire-rated party walls are typically framed with double stud walls (two separate 2x4 walls with a gap) or single stud walls with fire-rated assemblies. Total thickness including drywall is usually 6-8 inches minimum. The specific design depends on required fire rating and sound isolation targets.
Multiplex framing typically costs $15-$20 per square foot for labor depending on complexity, unit configuration, and fire separation requirements. A 3,000 sq ft duplex might have framing labor costs of $45,000-$60,000. Fire and sound separation requirements add complexity but our pricing remains competitive.
Toronto's zoning changes now allow multiplexes in many residential zones. Converting a single-family home requires permits, adding fire separations between units, separate mechanical systems, and often second means of egress. We can frame the required separations and modifications for conversion projects.
Contact us today for a free consultation and estimate on your project.
Request Quote Online(416) 901-6020Professional framers in Toronto for custom homes. Expert wood and steel framing for new builds, additions, and renovations. Licensed, insured, free estimates.
Garden suite builders in Toronto. Laneway suites, coach houses, and backyard dwellings. Framing, insulation, drywall. Licensed, permits assistance, free quotes.
Professional interior wall framing services in Toronto. Wood and metal stud framing for home renovations.
Contact Konstruction Group today for professional multiplexes services in Toronto and the GTA.
Get a Free Quote